design
► path of the page: home » design

Simulation in 4 steps

From project to manufacturing - Step 1 From project to manufacturing - Step 1
From project to manufacturing - Step 1 From project to manufacturing - Step 1

From project to manufacturing

Since project activities, the target for Moretti is to find the most suitable, versatile and innovative clamping solutions.


Every item is the result of a full synchronicity which develops throughout all production activities: from the 3D file, to the technical drawings till the manufactoring of the tooling. The whole process is made possible by the flexbility in the production and the high technological innovations which are the basis of Moretti philosophy.


Here we reported the simulation side in 4 steps of the project and manufacturing of a product: is a dedicated fixture for a company which produces A380 (currently the biggest aircraft for passengers engines).